Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Airport Infrastructure topic

No spam. Unsubscribe anytime.

Council approves runway lighting work at Port Airport, accepts $11,728.35 bid

Tekoa City Council · April 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council accepted an $11,728.35 bid from American Pride Electric to complete runway lighting at the Port Airport; two lower bids from the same vendor and a much higher bid from Power City Electric were recorded.

The Tekoa City Council approved funding for runway lighting at the Port Airport and accepted a bid from American Pride Electric on April 20.

CM Mike Hale summarized received bids: two from American Pride Electric ($11,728.35 and $17,122.65) and one from Power City Electric ($79,684.80). CM Ausmus moved to accept the $11,728.35 American Pride Electric bid and fund the work; CM Tysz seconded and the motion passed unanimously.

Council did not discuss additional technical details at length during the meeting; staff will proceed with contract execution and scheduling with the chosen contractor.