Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Industrial Corridors topic

No spam. Unsubscribe anytime.

Planning staff opens 30-day public comment on industrial-corridor draft after survey results

Horry County Planning Commission · May 28, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff opened a 30-day public comment period (ending July 2) on draft industrial-corridor language and a future-land-use map after a public survey (about 97 responses) showed respondents generally opposed siting industrial uses near residential areas and favored inland and rural locations with infrastructure.

Horry County planning staff opened a 30-day public comment period on a draft industrial-corridor policy and map after reporting public outreach results that will inform the draft.

Staff said the outreach included two open houses and a public survey with approximately 97 responses. "We've had approximately 97 survey responses," staff reported. Survey respondents typically opposed locating industrial uses near residential properties, historic downtowns and conservation lands and expressed preference for locating light and heavy industrial uses in inland and rural communities with adequate utility and road infrastructure. Staff also noted concerns raised about potential impacts on wetlands, air and water quality.

Staff asked the commission to open the comment period; a motion to do so carried. Staff said the public comment period would close on July 2, after which the commission could vote to forward the draft to county council.