Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Traxler Design topic

No spam. Unsubscribe anytime.

Model presented for Traxler Arboretum highlights accessibility, gravel drive and central pine

Avon Tree Commission · January 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Volunteer Paul Burik presented a physical model showing a simplified entrance path, handicap parking near the entrance, a largely gravel drive with paved handicap access, a screened trash bin location, and a proposed central pine tree; he outlined next steps including design development drawings and cost estimates and proposed planting the central pine to mark America’s 250th anniversary.

Volunteer designer Paul Burik presented a detailed physical model of the proposed Traxler Arboretum that emphasizes a simplified, straight-across entrance path intended to improve visitor navigation. The model includes designated handicap parking near the entrance, a gravel drive to minimize hardscaping with paved areas by the handicap spots, and a screened trash bin location intended to preserve visual character.

Burik described next steps including producing design development drawings and working with builders to generate cost estimates; he said he will rely on active builders for current market pricing because he has been retired for 16 years. He also proposed planting the central pine as a symbolic kickoff to the project and suggested expanding plantings near the new City Hall site and the vacant lot across from it—despite a sewer easement there—and proposed naming part of the project to mark America’s 250th anniversary.