Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Council orders report for $3.5 million in proposed 2027 street and utility improvements

Pelican Rapids City Council · July 29, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Apex Engineering presented proposed 2027 street and utility work (TH-59 frontage, 3rd/5th Ave SW, cured-in-place sewer lining near Pelican River, 1st St SE reconstruction) with preliminary cost estimates of about $3.5 million; council approved resolution 2026-13 to prepare the required project report and proceed toward a public hearing.

Bob Schleeman of Apex Engineering briefed the City Council on candidate streets and utility projects for 2027. He identified several surface-improvement candidates (Trunk Highway 59 frontage/North Broadway; 5th Ave SW; 3rd St SW) and utility-focused priorities including cured-in-place lining for a sanitary sewer near the Pelican River and full reconstruction on 1st St SE after repeated water-main breaks.

Schleeman presented preliminary funding options (Clean Water Revolving Fund, Drinking Water Revolving Fund, PFA eligibility distinctions) and a high-level cost table; he said the total estimated cost for the identified areas is "about 3 just shy of 3,500,000" in the presentation. Council discussed priorities, MnDOT turnback reimbursement for Highway 59 frontage, geotechnical borings and technical approaches (subgrade correction, drain tile, cured-in-place pipe), and then approved resolution 2026-13 to authorize preparation of the project report so the city can pursue funding and call a public hearing if it moves forward.