Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Operations topic

No spam. Unsubscribe anytime.

Heritage Pines approves additional cleanup at parcel 33, board to inspect wetland constraints

Heritage Pines Community Development District · December 10, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a proposal for perimeter cleanup, dead-tree removal and mulching at parcel 33, including an optional weed-whacker scope; District Engineer Kurt Heath noted a natural wetland in the center of the area and staff will inspect mowing constraints and native grass loss at Hole 2.

The board approved a proposal for additional cleanup at parcel 33, including perimeter cleanup, removal of dead trees and mulching, and accepted an optional scope for weed-whacker work on a dry retention slope. "Mr. Heath stated there is a natural wetland in the center of the area; on the western side there is some separate excavated retention area," the minutes record; he also said the south side is difficult to mow with equipment.

Mr. Adams said the invoice will be paid upon completion. Ms. Vaughan noted mulch had been installed and questioned whether mulch or brown bark wood chips were cheaper; Tim Gatz, the HPCA grounds superintendent, said the wood chips are free. The board approved the proposal on a motion by Mr. Walsh, seconded by Mr. Putman, with all in favor.