Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Board approves Ottertail Power right-of-way to bury cable under County Road 6

Kingsbury County Board of County Commissioners · May 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Kingsbury County Board approved a Right of Way application on May 5 for Ottertail Power to cross and occupy ROW along County Road 6 with all cable buried at least 40 inches and bored under the roadway; the chairman was authorized to sign the permit.

On May 5 the Kingsbury County Board approved a Right of Way application from Ottertail Power to cross County Road 6 and place cable within the county right-of-way. Auditor Echo Steffensen presented the application stating that all cable would be buried no less than 40 inches and that installation would be bored. The board approved the application and authorized Chairman Kyle Lee to sign (motion by Corey Lundquist; second by Troy Nelson).

The minutes record the burial depth requirement and the board’s approval but do not specify a permit number, anticipated construction schedule, or required restoration standards beyond the depth/bore requirement. No conditions or bond requirements were recorded in the minutes.