Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities topic

No spam. Unsubscribe anytime.

Staff urges replacement or retrofit of failing electric metering system after thousands of monthly read errors

Smithville City Council · July 31, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff told council that the electric metering/AMI system is failing and causes hundreds to thousands of errors per month and extensive manual reads; staff recommended procuring a new system compatible with the city's Tyler ERP to restore accuracy and recover lost revenue.

City staff described persistent metering and billing problems that generate hundreds or thousands of errors and require extensive manual reads. "They had 449 errors in July. They had 2,021 errors, warnings in, in July," Jennifer reported when explaining why the city needs a replacement or retrofit of its metering system to restore automated reads and reduce manual work and billing inaccuracies.

Staff said the failed or failing electric AMI hardware and software produces delayed and inaccurate data that creates time-consuming manual corrections, lost revenue, and customer confusion when corrected reads produce higher bills. Council and staff discussed options: retrofitting meter electronics compatible with existing meter bases to save cost, deploying customer portals (Mueller quote referenced at $21,000 for a water portal), and obtaining competitive bids by late August so the city can have numbers before any proposed bond or CO sale. Staff warned that transition to correct readings may produce customer complaints as previously underbilled accounts see increases.