Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Sewer topic

No spam. Unsubscribe anytime.

Florence authorizes design work on Hwy. 49 sewer project

Mayor and Board of the City of Florence · September 2, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board directed engineering staff to begin the design phase for the Hwy. 49 sewer project, with a separate motion later specifically authorizing Engineering Service to start design on the Hwy. 49 North Sewer Project; both motions were carried unanimously.

The Mayor and Board of Florence authorized engineering staff to begin design work for a sewer project on Highway 49. A motion directing City Engineer Tim Parker to begin the design phase was made by Alderman John Banks and seconded by Alderman Brent Sistrunk; the board carried the motion unanimously.

A subsequent motion recorded in the minutes again authorized Engineering Service to begin the design phase for the Hwy. 49 North sewer project. The minutes do not include design cost estimates or a project timeline; the board directed design work by motion only and did not set funding or contract details during the meeting.