Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Reconstruction After Fire topic

No spam. Unsubscribe anytime.

Board approves setback relief to allow reconstruction after house fire

North Attleboro Zoning Board of Appeals · July 31, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a February fire destroyed a home, the ZBA granted variances for Sherry Jensen to rebuild with an expanded footprint and attached garage, citing structural damage, soil disturbance from firefighting, and conservation coordination.

The Zoning Board approved variances June 18 to allow the reconstruction of a single-family dwelling for Sherry Jensen at 6 Wendy Drive after the existing home was deemed structurally unsound following a February 14 fire.

Engineer Larry Tilton told the board the foundation was damaged by fire and water and that a structural report concluded the house must be removed and rebuilt: "the house has to come down, needs to be removed, and build a new home." He described site constraints including buffer zones adjacent to a pond, planned conservation commission conditions and an upcoming Notice of Intent filing. The board approved relief of 4.2 feet on the side yard and 9 feet on the Natalie-side front yard to permit the rebuilt footprint.

The approval allows the property owner to proceed with demolition and reconstruction, subject to any conservation commission conditions and required permitting.