Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Systems topic

No spam. Unsubscribe anytime.

Berlin reports progress replacing valves, transducer and pump motors at multiple wells

Berlin municipal meeting · July 30, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff described recent and planned work at wells 4, 5 and 6: ion-exchange tank valves were repaired, a new transducer was installed at the School Street well, and pump motor and drive replacements were completed on Wisconsin Street.

During the meeting the Clerk provided details on recent equipment work across several well sites. The Clerk said the city replaced valves on the ion-exchange tank used for radionuclide removal, "we put in a new transducer for the well" at the School Street site (well 5) and installed a new motor and an EFT drive on the low pump at the Wisconsin Street well (well 6).

Staff said the new transducer will be integrated into the monitoring system once electronic programming is updated and confirmed. The Clerk invited questions about the work; members had no substantive objections on the record.