Traill County WRD schedules culvert deliveries, authorizes repairs and a culvert purchase

Traill County Water Resource District · April 7, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The district reported culvert deliveries for multiple Murray Drain bridge projects, approved repairs at Hatton Drain No. 45, and authorized purchase of a 24" x 60' culvert for Mayville Township to be supplied by TrueNorth Steel and installed by John/Peter Bakkum.

The Traill County Water Resource District received updates April 7 that culvert materials for Murray Drain No. 17 Bridge Nos. 223, 292 and 304 are expected to be delivered by month-end; Moore Engineering will coordinate delivery and installation with the Traill County Highway Department. The Board also learned that some culverts at Hatton Drain No. 45 sustained damage and will be repaired in 2026 by Naastad Bros. Inc.

Board engineer Nathan Trosen reported the trash rack for the Miller Drain No. 29 upper outlet structure has been delivered and installed. The Board agreed to authorize purchase of a 24-inch x 60-foot culvert and band for Section 24 in Mayville Township; the district will order the culvert from TrueNorth Steel and John/Peter Bakkum will pick up and install the culvert. Moore Engineering will coordinate the Murray Drain installations with county highway staff.