Developer seeks major buffer reductions at Merrell Park project; council presses safety and phasing questions

Chattahoochee Hills City Council · August 7, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Design team for Merrell Park proposed trimming several 300-foot buffers to as little as 60 feet along South Fulton Parkway and Cochran Mill Road to enable village-style development and a pedestrian tunnel; councilmembers raised safety, visibility, and financial-contingency concerns and requested clearer phasing and conditions.

Ryan, the design-team presenter for the Merrell Park plan, told the council the revised concept compacts the town-center footprint and asks for buffer reductions along Cochran Mill Road and South Fulton Parkway so phase 1 is "plausible and pencils out." He said the key reason to reduce one stretch from 300 feet to 60 feet is to make the pedestrian tunnel usable and to "bring eyes on the park," arguing that shorter buffers will improve trail safety by putting front doors and activity near the tunnel.

Council members pressed the applicant on several fronts. One councilmember said the 300-foot buffer had been an important distinguishing feature of the city and asked how cutting it to 60 feet did not erode the city's character. Another asked a practical question about topography and whether the developer could meet density without collapsing buffers; Ryan replied that topography and environmental constraints limit where multifamily and village-style housing can be placed and that reducing buffers allows hamlet-style housing and stormwater solutions to function.

The planner and staff explained the variance request is tied to the concept plan and that reductions are concentrated where the topography and a proposed pedestrian tunnel make a large buffer counterproductive to safety and usable trail connections. Ryan described the plan elements in detail: phased construction, a trail under South Fulton Parkway, conservation of wetlands within buffers when present, and a "hamlet-style campus" in one quadrant rather than large server-farm buildings.

Several councilmembers urged caution. One asked whether the city would be "playing banker" by effectively increasing property value for the landowner through annexation and zoning changes. Another asked about enforceable conditions — phasing, preliminary-plat deadlines and demolition or tree-cutting penalties — and whether the city could require the applicant to submit a final plat or LDP within a year; staff said the applicant must submit a preliminary plat within one year and subsequent approvals would be phased and subject to planning-commission and council review.

Ryan and staff emphasized the DRI and planning-commission process ahead: the variance and concept plan will go before the planning commission and then return to council for public hearings. Ryan said the density requested is within the village district range ("minimum 3 units per acre to 10") and that the design team had reallocated some nonresidential uses into the town-center core to preserve rural character elsewhere.

The council asked staff to provide additional materials before final action: precise timing of zoning changes vs. application timing, clarity on when buffers and rights-of-way will change with future road-buildout, and whether any legal protections shield applicants from subsequent regulatory changes. Mayor Castle asked staff counsel to research whether zoning changes after purchase confer any legal protections for the applicant. The council kept the item open for future public hearings and recommended additional packet detail on topography, buffer maps, and precise phasing conditions.