Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Greenway Stormwater topic
No spam. Unsubscribe anytime.
Plan includes trail connection, bridge replacement and green infrastructure; stormwater details deferred to LDP
Summary
Applicants agreed to improve an informal trail connection to the Big Creek Greenway and to replace a pedestrian bridge; stormwater sizing and final hydrology will be set during the Land Disturbance Permit (LDP) review after council approval.
Get email alerts on the Greenway Stormwater topic
No spam. Unsubscribe anytime.
Staff and the applicant told the Alpharetta Planning Commission that the project will include a public access easement and an improved trail connection to the Big Creek Greenway, with the applicant responsible for replacing a pedestrian bridge across Big Creek as an off‑site improvement eligible for impact‑fee credits.
Staff emphasized that none of the development encroaches on the stream buffer or floodplain and pointed to a 25‑foot undisturbed tree‑save strip and other tree‑preservation measures. The applicant described multiple green‑infrastructure measures—runoff reduction pockets in courtyard areas, reserve space for stormwater ponds, and multiple layers of runoff reduction feeding detention ponds—designed to limit runoff before discharge to the larger pond and then to the creek. Planning staff explained that detailed hydrology, pond sizing and erosion control plans are part of the LDP review and will be required after any council approval and prior to clearing and grading.

