The commission reported the toolshed installed on 11/25 is ready, erosion repairs on the Lake Trail and North Dike were completed, meadow boardwalks were reset and chipped, and some additional bridge and causeway leveling work remains.
Get email alerts on the Trails topic
No spam. Unsubscribe anytime.
The minutes record that the toolshed installed on 11/25 is now ready for use after Ann Roy met with Barbara Rhodes and transferred trail tools from the Constitution House. Maintenance updates list Mark E. and Rebecca Haynes repairing eroded spots on Lake Trail and addressing Muskrat denning on the North Dike. Pieter reset and chipped meadow boardwalks and expects another load of chips to be dropped at the east side of the field.
Members noted remaining work: a Constitution Trail bridge abutment still needs leveling and the North Causeway may need resetting once the beaver‑deceiver piping is reinstalled. The commission did not record additional expense approvals at this meeting; routine maintenance tasks were reported as completed or scheduled.