Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Seasonal Pier topic

No spam. Unsubscribe anytime.

Planning board approves seasonal pier for Solaris with updated project description required

Phippsburg Planning Board · July 27, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a fully seasonal pier for a Solaris property with conditions: applicant must submit an updated project description clarifying off‑site storage and provide two hard copies and a $100 filing fee.

Ellie O’Brien, representing Solaris, described a fully seasonal pier and flotation system pinned to ledge: a 6-foot-wide by 42-foot-long pier, a 3-foot-by-40-foot seasonal ramp and a 10-by-20-foot float. O’Brien said all components would be removed from the intertidal zone during the off season and stored off-site; she cited available storage space in a West Bath industrial park.

After board discussion about clarification of the project description and how components would be stored and removed, a motion to approve carried with a condition that the applicant submit a corrected project description clarifying that all seasonal components will be removed from the intertidal zone and stored off-site, provide the board two updated paper copies and remit the standard $100 fee. ‘‘The whole structure would be removed during the off season and stored,’’ O’Brien said when asked to confirm the storage arrangement.

The board also requested photos and clear narrative language about ledge pinning and any DEP or BP determinations that affect removable seasonal structures.