Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water And Sewer topic

No spam. Unsubscribe anytime.

Council authorizes VFDs for well pumps, discusses emergency sewer work on 6th Street

City of Ellendale City Council · April 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City approved up to $16,000 to install Variable Frequency Drives on well pumps and discussed an emergency sewer blockage at 703 6th St. S., with a possible sleeve-by-boring repair being pursued.

The Ellendale City Council approved electrical and equipment work to modernize well-pump controls and discussed an emergency sewer repair discovered under a private driveway on 6th Street South.

Maintenance & Utility Supervisor Josh Otto presented a $14,702 quote from Midwest Pump for Variable Frequency Drives (VFDs) for the wells and an estimated $1,500 electrical side from Resler Electric; the council authorized up to $16,000 for the VFD installation and related wiring, noting that VFDs better regulate flow and reduce wear versus valve throttling. Otto also reported a sewer backup on 6th Street S. where Olson Excavating found that a manhole shown on city maps had been removed; Empire Pipe was engaged to televise the line and Engel requested a quote for installing a sleeve by boring rather than removing a driveway to fix a separated joint beneath 703 6th St. S.

Council approved the VFD funding by roll call with all members voting aye. The council recorded no vote on the sleeve option yet; Engel will obtain a firm quote from Empire Pipe for a sleeve-by-boring repair to avoid full driveway excavation.