Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater Drainage topic

No spam. Unsubscribe anytime.

Board hires H2M for Linwood drainage survey to inform engineering plans

Board of Trustees of the Incorporated Village of Farmingdale · September 16, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees approved hiring H2M to perform survey work needed to create plans addressing the Linwood drainage problem. The motion was made by Trustee Parisi and seconded by Trustee Priestley.

On Sept. 16 the Board approved a resolution (#2025-09-09) to retain H2M for survey work to support planning for the Linwood drainage issue. Trustee Cheryl Parisi moved the resolution and Trustee Walter Priestley seconded; the minutes record the Board's approval to proceed with engineering survey services.

Minutes note that the survey work is a necessary step to make plans for longer-term drainage remediation; staff will return with engineered plans once survey and design work are complete.