Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Residential Permitting topic

No spam. Unsubscribe anytime.

Commission approves pool and septic upgrades with conditions and planting mitigation

Eastham Conservation Commission · July 31, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After addressing flood‑zone setbacks, legacy tree follow‑up and pool performance standards (dry wells, lighting, filling plan), the commission approved the Petrica family's pool, septic upgrade and landscape plan at 20 Bridal Road with special conditions and required written confirmations.

Rick Grady of Grady Consulting presented revisions to a previously discussed proposal for 20 Bridal Road, which includes a new pool, reconstruction of patios, a new septic system and landscape mitigation. The applicant team revised the plant list to native species and reduced impervious area in parts of the site; staff said the revised layout keeps the septic outside flood‑zone setbacks after rotating the leaching area.

Commissioners asked for a dry well detail and specific compliance statements for pool chemicals and lighting; Nicole (applicant) said she was willing to meet planting and mitigation requirements and to alter hedge species if requested. The motion to approve included special conditions for single‑family dwellings with landscape and construction protocols; the agent will require follow‑up planting details and legacy tree permitting if the trees meet the planning board threshold.