Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Storm Resilience topic

No spam. Unsubscribe anytime.

CDD hears storm surge resilience plan; staff cites potential for widespread flooding in a 10'–12' surge

River Ridge Community Development District Board of Supervisors · October 22, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

District staff described a resilience plan and proposed an advisory/review panel; a hypothetical topographic map presented at the meeting showed that a 10'–12' storm surge could have flooded an estimated 45%–55% of the community, prompting the Board to designate staff and a supervisor to assist.

Eric Long outlined an action plan to build community resilience against storms and climate change and asked the CDD to designate a Board representative and staff or engineering representative to help coordinate multiagency efforts. Long proposed creating an advisory/review panel to assist with planning and potential partnerships with neighboring communities.

The minutes record that Mr. Long "discussed a hypothetical regarding Hurricane Milton in which a topographic map showed that a 10’ to 12’ storm surge could have caused 45% to 55% of the community to be flooded." He said addressing the issue could take up to a decade and would require coordination with state, county and village authorities. The Board reached a consensus that Mr. Long and newly appointed Mr. Merrill will assist; Mr. Krebs was authorized to provide support as necessary.