Get email alerts on the Infrastructure Lake Management topic
No spam. Unsubscribe anytime.
Board approves temporary 'zombie box' for Lake E1-C aerator after split vote
Summary
Faced with a $10,755 relocation proposal for an aerator in Lake E1-C, the River Ridge board approved installing a temporary 'zombie box' for $3,098. The measure passed 3-2 with Mountford and Blumenthal opposed.
Get email alerts on the Infrastructure Lake Management topic
No spam. Unsubscribe anytime.
District operations staff presented a proposal from Premier Lakes and a revised Bentley Electric proposal to relocate the aeration system in Lake E1-C farther from the originally proposed location. The relocation would add roughly 125 feet of electrical work and was estimated in the $10,755 range. Board members debated whether to proceed with full relocation now or take a lower-cost interim approach.
On a motion by Bob Schultz, seconded by Robert Twombly, the board approved installing a 'zombie box' at the current location—an interim measure to address aeration power needs—for $3,098. The vote passed 3–2 with Mr. Mountford and Mr. Blumenthal recorded as dissenting. Staff will revisit the larger relocation proposal during FY2026 budget discussions.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
