Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facilities topic

No spam. Unsubscribe anytime.

Buildings and grounds report notes EV charging installation and maintenance work

Hazel Crest School District 152-5 Board of Education · April 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The district's buildings and grounds director reported preventive maintenance, repairs to restroom fixtures, stage-light work and installation of EV charging stations with possible paving inside the fence.

Joe Sierra, the district's Director of Buildings and Grounds, told the board the department completed a preventive maintenance evaluation of pumps, repaired bathroom fixtures, continued work on stage lights and is installing EV charging stations on district property. He said paving inside the fence is being considered in conjunction with the charger installation.

The board did not take a separate vote on facilities work during this meeting; the updates were provided as part of routine department reports. Staff gave no timetable or contract award details for paving or charger installation in the minutes.