Buildings and grounds report notes EV charging installation and maintenance work
Summary
The district's buildings and grounds director reported preventive maintenance, repairs to restroom fixtures, stage-light work and installation of EV charging stations with possible paving inside the fence.
Get email alerts on the Facilities topic
No spam. Unsubscribe anytime.
Joe Sierra, the district's Director of Buildings and Grounds, told the board the department completed a preventive maintenance evaluation of pumps, repaired bathroom fixtures, continued work on stage lights and is installing EV charging stations on district property. He said paving inside the fence is being considered in conjunction with the charger installation.
The board did not take a separate vote on facilities work during this meeting; the updates were provided as part of routine department reports. Staff gave no timetable or contract award details for paving or charger installation in the minutes.