Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Playground Project topic

No spam. Unsubscribe anytime.

Designs unveiled for inclusive Sherwood playground; estimated cost $381,751

Board of Education, North Shore SD 112 · February 17, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Play Illinois presented a 4,000 sq. ft. inclusive playground design for Sherwood Elementary that would accommodate about 161 children, include 49 play events, and cost an estimated $381,751. The board will consider approval on March 17.

Play Illinois representative Margaret Chaidez presented the District 112 Board of Education with designs for an inclusive Sherwood Elementary playground that would replace the existing play area on the south end of the new building.

The proposed 4,000-square-foot play area is designed to accommodate approximately 161 children, feature 49 play events including climbing equipment, spinning elements, slides and swings, and provide quiet, shaded spaces. Materials presented to the board specify a poured-in-place rubber surface to ensure accessibility and safety for students of all abilities. The estimated project cost was reported as $381,751 and the vendor team indicated the installation would occur over the summer.

Board members voiced support for the proposal during the presentation; district staff said the project will be brought back for board approval at the March 17 regular meeting.