Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Contracts topic

No spam. Unsubscribe anytime.

Selectboard chair signs East Engineering contract to finalize bridge project paperwork

Fayston Selectboard · January 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Chair Chuck Martel signed the contract prepared by East Engineering for the two bridge projects; the Selectboard Assistant will forward the document to East Engineering and Winterset for their signatures.

Chair Chuck Martel signed the contract that East Engineering prepared for the replacement of the Randell Road and Airport Road bridges and asked staff to circulate it for other required signatures.

"Chuck signed the contract that East Engineering has prepared. Madi will forward it to Tyler so that Winterset can sign their portion of the document as well," the minutes state. The board recorded no additional contractual details or a construction schedule in the minutes; staff follow-up will determine the next administrative steps.

The signing is an administrative step following the board's decision to award the construction contract to Winterset. The minutes do not record any discussion or dissent related to the execution of the engineering contract.