Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Road Maintenance topic

No spam. Unsubscribe anytime.

Tinmouth highway crew reports crack-sealing complete, warns Gulf Road erosion needs excavator work

Tinmouth Select Board · July 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Highway staff reported that crack sealing and mowing are underway, but multiple gully-washing storms have left Gulf Road (class 4) eroded and passable only with seasonal work; staff estimated a couple of 8-hour days with an excavator to reroute water and reshape ditches to prevent further washout.

The highway report said crack sealing is complete and that crew time has been diverted by storm cleanup, delaying some mowing work. "Crack sealing's done," the highway speaker (S3) reported, and described redirecting effort to storm damage cleanup and pothole work.

S3 warned about Gulf Road, saying it is "passable right now, but, I mean, without some work, it's just a matter of time," and estimated it would take "probably a minimum of a couple of 8 hour days with the excavator" to reroute water, reshape ditches and get the road passable for the long term. Board members discussed scheduling, equipment availability and the need to protect downstream private property from increased runoff; members asked the road commissioner to check timing and coordinate excavator work when staff and contractor availability align.

The board also discussed roadside mowing hazards and crew safety during high-traffic mowing operations; one member said it can be "so stressful" to work where motorists pass closely. No capital appropriation was approved at the meeting; members asked staff to prioritize Gulf Road repairs before further deterioration.