Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Highway Superintendent Details Bridge Work and a $70,438.95 Small-Structure Cost

Blackford County Council · November 6, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Highway Superintendent John Pluimer presented photos and video of repairs to Bridges 56 and 57, reported a $70,438.95 cement box structure replacement at 500 S & 500 E, and said the next major road closing will be on 500 E by the jail; radios installed and grant pursuit for Hazardous Waste Day also noted.

Highway Superintendent John Pluimer presented pictures and video showing repairs by Pro Concrete to Bridge 56 and Bridge 57 and said the repairs involved raising the roadway. He reported that a small cement box structure at 500 S & 500 E will cost $70,438.95. Pluimer also warned the next major road closing will be on 500 E near the county jail and noted that county radios have been installed.

Pluimer said the county is in a second round for a grant to support Hazardous Waste Day. The minutes do not record a formal vote on the bridge work or the small-structure contract in this meeting; cost figures were provided as project updates.