Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Economic Development topic

No spam. Unsubscribe anytime.

Jury approves feasibility study for proposed wood pellet plant, to be paid from Winn Industrial Board Fund

Winn Parish Police Jury · December 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Winn Parish Police Jury authorized Quantum Engineering Group, LLC to prepare a feasibility study for a proposed wood pellet plant; the Winn Parish Industrial Board recommended approval and the study is expected within six to eight weeks.

The Jury voted to contract with Quantum Engineering Group, LLC to prepare a feasibility study for a proposed wood pellet plant, with the work to be paid from the Winn Industrial Board Fund. Motion was made by Mr. Author Robinson and seconded by Mr. Phillip Evans.

President McLaren noted the Industrial Board had recommended approval and the minutes state, "We should have the study within 6 to 8 weeks." The Jury recorded the vote as carried (5 yeas, 0 nays, 1 absent, 1 abstained). The minutes do not provide study cost or the contractor's scope beyond the feasibility task; those details will be part of the subsequent contract documentation and the study deliverable is expected to return to the Jury for review.