Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Engineer warns Ansuz LLC AFO may violate 1,000-foot setback from Egg Creek; Board adopts HDR recommendations

Ward County Water Resource Board · June 8, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

HDR engineer Dennis Reep told the Board the northern portion of the Ansuz LLC proposed animal feeding operation appears to be about 400 feet from Egg Creek, short of the 1,000-foot setback in Ward County zoning rules; the Board voted 5-0 to adopt HDR's plat recommendations including consideration of a stormwater management plan.

Engineer Dennis Reep reviewed plat applications and recommended returning them to the County with conditional recommendations: require a stormwater management plan for certain special‑use/subdivision cases and prohibit development that would obstruct watercourses or divert surface water flows. Regarding the Ansuz LLC Conditional Use Application in Surrey Township (an animal feeding operation), Reep cited Ward County Land Zoning Ordinances (July 1, 2025), Article V, Section 5.02.12.b.i.4, which require a minimum 1,000-foot setback from surface water that is not in a source water protection area. Reep reported the northern portion of the proposed AFO appears to be roughly 400 feet from Egg Creek and recommended consideration of a stormwater management plan.

Roger Kluck moved to approve and adopt HDR's recommendations; Dale Dohms seconded and the motion passed 5-0. The minutes record the engineer's technical recommendations but do not record any action beyond adopting the recommendations for County consideration.