Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water Sewer topic

No spam. Unsubscribe anytime.

Water plant float failure briefly took Pump 1 offline; TAG repaired float and will investigate electrical issue

Westfir City Council · March 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Pump 1 at Westfir's water plant lost prime due to bad floats in the chlorine chamber; Automation Group (TAG) replaced a float, staff will replace additional floats and investigate an electrical issue. Council discussed reviewing water infrastructure for fire suppression capability.

City Operator Bobby Archer reported that Pump 1 at the water plant lost prime because of bad floats in the chlorine chamber. Archer called Max Baker, the city’s certified consultant, and the Automation Group (TAG) replaced a float that restored operation.

TAG will replace additional floats and research an electrical issue that remains unresolved. Archer reported there were no problems at the wastewater plant. Mayor Richard Watson and Archer discussed reviewing the city’s water infrastructure for fire suppression capability; no formal action was taken at the meeting.