Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Telecom Infrastructure topic

No spam. Unsubscribe anytime.

Verizon proposes antennas on Palmer’s Shopping Center clock tower; board requests closer renderings

Board of Trustees of the Incorporated Village of Farmingdale · November 18, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Verizon presented plans to mount multiple antennas on the Palmer’s Shopping Center clock tower and install a larger clock; the Board of Trustees asked for closer renderings and engineering review before scheduling the required public hearing (now set for Jan. 6, 2025 on the resubmission).

Denise Vista of the Amato Law Group presented Verizon’s pre-conference plans to install multiple communications antennas on the clock tower at Palmer’s Shopping Center and said the project would include a new, larger clock intended to enhance the tower’s appearance.

The Board was told structural and engineering analysis is being prepared by Dvirka & Bartilucci. Trustees asked for a closer rendering of the proposed installation to verify that the antennas would be adequately camouflaged and that the project would preserve the tower’s aesthetic value. The minutes record that the timing of the required public hearing will depend on the submission of outstanding information. The Building Department later recorded receipt of Verizon’s resubmission and scheduled the public hearing for Jan. 6, 2025.