McIntosh reports water tower, paving and lead-pipe progress; $44,975 electrical-panel bid approved from ARPA

McIntosh Town Council · November 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Town Manager TM Gonzalez reported the water tower project has started with a temporary tank; the council accepted a $44,975 bid from TLC Automation for electrical-panel upgrades to be paid from ARPA funds. Paving on Avenue D, H and 5th St., and near a repaired water line, is underway; the lead-pipe replacement project is nearly complete.

Town Manager TM Gonzalez told the council the water-tower project is underway and that a temporary tank is being installed to maintain service while work proceeds.

Gonzalez said the town accepted a bid from TLC Automation for $44,975 for electrical-panel upgrades at the water tower and indicated the expenditure will come from ARPA funds. He also reported that paving projects have started on Avenue D, Avenue H and 5th Street and that crews will patch an additional spot on Avenue H where a water-line repair recently took place. Gonzalez added that the lead-pipe replacement project is nearly complete and that arborist reports were conducted at several locations, including a tree near Marsha Strange’s property on Avenue H.

Council did not take separate votes on paving or lead-pipe items at the Nov. 19 meeting beyond the acceptance of the electrical-panel bid and included project reporting in the manager comments section.