Get email alerts on the Maintenance topic
No spam. Unsubscribe anytime.
Board approves additional cleanup work at '33' including dead-tree removal and mulching
Summary
Supervisors approved a proposal for additional cleanup at location '33'—perimeter cleanup, removal of dead trees and mulching—with optional weed-whacker work on a dry retention slope; the engineer noted a natural wetland in the area and maps will be provided to a supervisor.
Get email alerts on the Maintenance topic
No spam. Unsubscribe anytime.
The board approved a contractor proposal for additional cleanup at area '33' after a site visit and discussion of scope. The approved scope includes perimeter cleanup, removal of dead trees and mulching; an optional scope covers weed-whacker cleanup on a dry retention slope. District Engineer Kurt Heath noted there is a natural wetland in the center of the area and a separate excavated retention zone on the western side.
Maps will be provided to Supervisor Stephen Putman to clarify the CDD property boundary—the area from the wall to the white stakes was identified as CDD property—and the invoice will be paid upon completion. "On MOTION by Mr. Walsh and seconded by Mr. Putman, with all in favor, the proposal for additional cleanup at 33, including the optional scope of work, was approved," the minutes record.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
