Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Road Closure topic

No spam. Unsubscribe anytime.

O’Brien County adopts resolution to close 370th Street for bridge replacement

O’Brien County Board of Supervisors · April 29, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The O’Brien County Board of Supervisors unanimously adopted Resolution 2025-10 to temporarily close a section of 370th Street between Wilson and Yew Avenue for bridge replacement, requiring "ROAD CLOSED" signs at both ends until construction is finished.

On April 29, 2025, the O’Brien County Board of Supervisors adopted Resolution 2025-10 to temporarily close a segment of local road for bridge replacement. The resolution names the affected roadway as 370th Street between Wilson and Yew Avenue and directs that "ROAD CLOSED" signs be placed at both ends of the described segment until construction is completed.

The resolution cites Section 306.41 of the Code of Iowa as the board’s statutory authority to impose temporary road closures for construction, maintenance, or natural disaster. The motion to adopt the resolution was moved by Supervisor Vanden Hull and seconded by Supervisor Thomas; the minutes record that the motion "carried by all ayes." The minutes were attested by County Auditor Rhea Schmalen and signed by Chair Barbara Rohwer.