Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Subdivision topic

No spam. Unsubscribe anytime.

Donald Jones subdivision accepted; commission requires deed references, septic and water location on plan

Salem Township Planning Commission · March 4, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission accepted the Donald Jones subdivision application as complete and requested the Deed Book/tax references, lot areas, existing on‑lot septic location, and labeling of public water mains be shown on the plan before approval.

The Planning Commission accepted the Donald Jones subdivision application as complete with surveyor Michael Vadas (LSSE) and owner Donald Jones present. Solicitor Ryan Thomas and staff asked that the Deed Book volume and tax map references (including previous plan book volume/page) be shown on the plan, that existing and proposed areas for Lots A and B be shown within lot boundaries, and that the existing on‑lot septic for the dwelling on Lot A and the public water line location be plotted and labeled on the plan.

The commission also noted that an Owner's Certification for William T. Ahlborn with notarization must be added, that front building lines must be shown (30' building line from right‑of‑way except specified state routes), and that a non‑building waiver form signed by owners must be submitted with a required SEO site inspection for final approval.