Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Drainage board approves QC Communications fiber installation with minimum-boring requirement

Allen County Drainage Board · April 2, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved QC Communications' petition (Doc #26-075) to install fiber optic cable and two vaults in the Doctor Drain easement, with a requirement that directional boring be shown at least 5 feet below ditch grade or 3 feet below tile on plans.

QC Communications (contact Linde Baker) received board approval to install fiber optic cable by directional bore and to place two new vaults on the north side of E Tillman Rd within the Doctor Drain easement (Doc #26-075). ACSO recommended approval and noted a minimum requirement that boring be shown on plans as 5 feet below the lowest ditch grade or 3 feet below tile; the board approved the petition on a motion by Rich Beck, seconded by Jim Orr.

The minutes record that a revised plan was received on March 31, 2026; the approval was conditioned in the record by specifying the minimum boring depth to be shown on construction plans. No roll-call tally was recorded in the minutes.