Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Operations topic

No spam. Unsubscribe anytime.

Heritage Pines board approves cleanup at parcel ‘33,’ notes wetland constraints

Heritage Pines Community Development District · December 10, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a proposal for additional cleanup at parcel '33' including perimeter cleanup, removal of dead trees and optional weed‑whacker work on a dry retention slope; District Engineer Kurt Heath noted a natural wetland and difficulty mowing some areas.

The Board approved a proposal to perform additional cleanup at the site referred to in the minutes as parcel '33,' including perimeter cleanup, the removal of dead trees and mulching. The proposal included an optional scope of weed‑whacker cleanup in the dry retention slope area; on motion by Michael Walsh and seconded by Stephen Putman the proposal (including the optional scope) was approved.

District Engineer Kurt Heath advised that there is a natural wetland in the center of the area and an excavated retention area on the western side, and he noted the south side is difficult to mow with equipment. Chair Kathleen Lonergan asked that maps be provided to Supervisor Putman; Mr. Adams said the invoice will be paid upon completion.