Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
Board defers controller replacement, weighs SCADA readiness pending well inspection
Summary
The Board reviewed two quotes to replace mercury switches in pump-house controllers—one basic replacement and one SCADA-ready option—and deferred purchase until after a well pump inspection; engineering said full SCADA additions for water sites could cost $25,000–$50,000 per site.
Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
Director of Public Works Keith Leitzinger presented two quotes for replacing mercury switches in pump-house controllers: a basic functional replacement from B&M Electric and a Pilling quote configured for SCADA integration and telemetry readiness. Engineer Jordan Fure advised the Board that adding full SCADA capability to water system sites could add about $25,000–$50,000 per site, and suggested deferring the controller decision until the condition of the well is known following a pump pull inspection.
The Board voted to defer both quotes until after the well inspection so staff can confirm needs and consider financing options; the Clerk was asked to explore whether a bank loan would be appropriate for this type of capital purchase. Trustees framed the decision as a way to avoid unnecessary capital outlay prior to knowing well condition and broader system needs.
