Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Broadband topic

No spam. Unsubscribe anytime.

Board hires Delta 3 to set conditions for TDS fiber work after sewer-televising concerns

Village of Bloomington Regular Board · March 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Delta 3 Engineering was contracted to review TDS fiber installation plans and establish compliance requirements after televising showed conduits running through sewer mains; the board emphasized limits on unrestricted digging.

After sewer televising revealed conduits located through sewer mains, the board approved contracting Delta 3 Engineering to review TDS fiber installation plans and set compliance requirements.

Mark Digman outlined specific requirements he would recommend to TDS, including pre- and post-televising of sewer crossings, maintaining five-foot clearances from hydrants, proper easements, erosion control measures, and timely lawn restoration. McLimans warned that the village will not grant blanket permission for unrestricted digging, citing recent infrastructure repair issues on Mill Street.

"The village cannot give carte blanche permission for unrestricted digging, particularly given recent infrastructure repair issues on Mill Street," McLimans said, and the board voted to retain Delta 3 to ensure TDS plans meet village standards before work proceeds. The motion passed unanimously.