Hearing continued for 163 North Worcester Street addition after staff review: riverfront disturbance near 10%
Summary
Rim Engineering presented an addition and raised‑deck plan for 163 North Worcester Street that, combined with prior disturbances, totals about 9.97% of the riverfront area; the commission requested helical‑pile details and the DEP file number and continued the hearing to Aug. 10.
Get email alerts on the Riverfront Disturbance topic
No spam. Unsubscribe anytime.
Representatives for the property at 163 North Worcester Street described a proposed addition and raised deck supported by helical piles, along with relocation of an existing septic tank and associated ground disturbance. The consultant said the combination of prior and proposed disturbance measures amounts to about 9.97% of the riverfront area, just under the commission’s 10% threshold.
"The combination of that, the the previous work and the proposed work comes up to 9.97% of the riverfront area," the applicant’s engineer reported. Commissioners asked for a plan detail showing helical‑pile heights and for confirmation of whether the existing leaching field was counted as degraded area; the hearing was continued to the commission’s Aug. 10 meeting pending receipt of the DEP file number and the requested pile details.