Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Compatibility topic

No spam. Unsubscribe anytime.

Applicants note tree removal during earlier phase; board asks for compatibility details

South Burlington Development Review Board · April 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Applicant said a 12-inch tree called out for protection in staff comments had already been removed during the previous turf-field project and replaced with three new trees; the board asked the applicant to show materials, colors and compatibility on the plans.

The applicant acknowledged that a 12-inch tree the city asked be protected had already been removed during the prior turf-field project and said three replacement trees were installed along the new walkway. Greg Dixon said the planned accessory buildings will be modest, likely prefab with a board-and-batten look, and that the applicant would select colors to help them blend with the existing school building.

Staff asked the applicant to update plan sheet C1.01 to include EPSC notes, slope stabilization details and the existing screened dumpster location prior to issuance of a zoning permit. Dixon agreed to add the dumpster to the proposed plans and to review and update erosion- and sediment-control measures as requested by staff.