Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Westhaven Prelim Plat topic

No spam. Unsubscribe anytime.

Westhaven Estates preliminary plan revised; city asks for follow-up on cul-de-sac length, riparian setbacks

Avon Planning Commission · March 18, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Karpinski Engineering presented a revised preliminary plat for Westhaven Estates (34 homes). The city praised stormwater improvements but identified outstanding items — including cul-de-sac length, riparian setbacks and lot-size matters — and did not recommend a vote at this second presentation.

Karpinski Engineering presented revisions to the Westhaven Estates preliminary plat on Detroit Road, reporting changes made in response to city engineering comments: removal of lots with direct Detroit Road driveways, ensuring 100-foot frontage at the building line, conversion of an unbuildable lot into common block D due to riparian constraints, and the addition of a detention basin intended to reduce peak outflow by roughly 60–80%.

City Engineer Ryan Cummins said the design showed substantial progress and many engineering improvements, but also listed outstanding items that prevent recommendation of a vote at this time — notably a proposed cul-de-sac that may exceed length regulations and unresolved riparian-zone and lot-size questions. Planning staff likewise declined to recommend approval and noted the plan will need further engineering refinements and utility approvals (FirstEnergy and sanitary coordination) before a final presentation.