Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use topic

No spam. Unsubscribe anytime.

Denton board requires 35-foot turnaround for 6th Street; developer told of $25,000 increase

Board of Trustees of the Village of Denton, Nebraska · December 4, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Following a submission from Olsson and Associates, trustees required a 35-foot radius turnaround at the end of 6th Street per subdivision regulations and instructed the clerk to notify developers; the board was told the required cul-de-sac increases costs by about $25,000 from preliminary plat figures.

The board reviewed a cul-de-sac plan submitted by Olsson and Associates related to a development tied to Linda’s retirement update. The board voted to require a turnaround at the end of 6th Street with a 35-foot radius as required by subdivision regulations; the clerk is to notify the developer and provide the engineer’s drawings.

Meeting minutes note the board was told adding the cul-de-sac will increase the cost for the property by $25,000 compared with the preliminary plat figures. The motion passed on a vote recorded in the minutes; the clerk will handle notifications to the developers.