O&M manager details flood response and January spills; staff credit field crews
Summary
Operations staff reported multiple January spills tied to regional flooding, a small 5‑gallon yard spill and three category‑1 incidents; crews used vac trucks, bypass pumps and continuous staffing to keep total volumes below public notification thresholds and protect residents.
Get email alerts on the Spills Response topic
No spam. Unsubscribe anytime.
Paul Brummer, the district’s operations and maintenance manager, reported on training, flood inspections and spill response during the board’s Feb. 18 meeting. He said all district staff completed Cal‑OSHA‑approved first aid and CPR training in January, crews inspected pump stations after significant flooding at Riviera Circle and replaced a failed flow‑meter from stock to restore monitoring.
Regarding spills, Brummer said one small spill (about 5 gallons) occurred in a backyard easement due to root and rag buildup and was fully contained and cleaned. Three other category‑1 spills were tied to the Riviera Circle flooding; crews staged overnight, ran vac trucks and a 6‑inch bypass pump, and completed about 49 full vac loads to manage flows and protect homes. Brummer emphasized that staff kept total volumes below the 50,000‑gallon threshold that triggers broader public sampling and notification and commended field crews for their response.
Provenance: topic intro SEG 1689; topic finish SEG 1846.