Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Environment And Maintenance topic

No spam. Unsubscribe anytime.

Engineers flag West River drainage limits; residents ask about impervious surfaces and snow removal

Woodbridge Economic Development Commission · July 30, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

SLR said the West River controls water elevations and that major river modifications would be needed to solve high‑water flooding; residents also asked who will maintain and clear additional sidewalks and medians after construction.

Engineers told the meeting that the West River controls local water elevations in the project area and that, during very heavy rainfall, local drainage improvements cannot eliminate river‑driven flooding without major river work beyond the scope of the LOTCIP grant.

"The West River actually controls the water elevation in this whole vicinity," Paul DeStefano said, noting that substantial river modifications would be required to eliminate severe flooding.

Residents also asked about who will be responsible for snow removal and ongoing maintenance of new sidewalks and planted medians. Presenters said planting choices aim to minimize maintenance and that property owners will retain their existing responsibilities for clearing sidewalks while the town will maintain green medians created by the project under the project authorization agreement.