Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Energy topic

No spam. Unsubscribe anytime.

Draft ordinance would allow Wadsworth to join AMP 2027–2030 fixed-volume energy schedule capped at $59/MWh

Wadsworth City Council Committee of the Whole/Finance · April 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The ordinance would authorize the Director of Public Service to execute a 2027–2030 Fixed Volume Energy Supply Schedule with American Municipal Power (AMP), allowing purchases up to 5 MWh per hour and limiting third-party contract prices (excluding taxes and fees) to $59.00 per MWh.

The committee packet includes a detailed draft ordinance and Exhibit 1 that would authorize the City to participate in American Municipal Power's (AMP) 2027–2030 Fixed Volume Energy Supply Schedule. The ordinance authorizes the Director of Public Service to execute the schedule and acquire energy from AMP under Long-term Energy Purchases with a contract-price cap of $59.00 per MWh (excluding taxes, transmission, replacement energy, losses, congestion, security costs, and AMP service fees) and a maximum purchase volume of 5 MWh per hour.

Exhibit 1 (AMP Contract No. 2027-012680-ESS) describes procedures for AMP to consult the Municipality's Authorized Representative (the Director of Public Service or a designee) before finalizing purchases and reiterates the $59.00/MWh cap and the 5 MW hourly volume limit. The ordinance waives competitive bidding requirements for acquiring the right to secure energy under the schedule.