Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Highway Maintenance topic

No spam. Unsubscribe anytime.

Ira Select Board approves highway equipment purchases, flags Weaver Hill for engineering

Town of Ira Select Board · June 23, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized purchase of a chainsaw and recorded smaller equipment purchases for the town garage, noted the humidifier installation, and identified Weaver Hill as needing engineering; Cross Roads will receive ditch cleaning, riprap and gravel work.

During the June 23 meeting the Select Board logged a set of highway purchases and maintenance plans. Nathan Hewitt reported purchases including an extension cord, garden hoses, and a grease gun; the humidifier was set up in the town garage. The board approved buying a chain saw on a motion from Tim Carter, seconded by Darin May; the motion passed unanimously.

Tim Carter and Bobbi Raiche drove roads with Ethan from RRPC and reported that Weaver Hill requires engineering. The board also recorded planned work at Cross Roads — cleaning ditches, seeding banks, adding riprap, and placing additional gravel where needed. Exact engineering scope and project schedules were not specified in the minutes.