Residents press board on Blue Acres waterfront plans, water testing and porous pavement
Summary
During the presentation on the Raritan River resilience study, residents asked about water testing at a proposed fishing pier, maintenance and feasibility of porous pavement at Blue Acres sites, and potential loss of ratables in an industrial Causeway area; borough staff and consultants responded.
Get email alerts on the Blue Acres Waterfront topic
No spam. Unsubscribe anytime.
Public commenters raised questions about waterfront conditions and materials during the Resilient NJ presentation. Ann Marie Briscese asked specifically about water cleanliness at the location of a proposed fishing pier; consultants and staff replied that the waters had not been tested and noted that fishing currently occurs at the site. Pippa Brashear said the team was exploring porous materials but warned maintenance would be necessary; Vicki Chou told the board that "NJDEP and OEM are not interested in porous pavement on the Blue Acre sites."
An Environmental Commission member, Shari Garretson, said she had not been aware of the study and pressed whether the commission or residents were included on the Blue Acres team. Garretson also asked about industrial uses along the Causeway and whether the borough could lose ratables; Administrator Art Londensky described those businesses as preexisting nonconforming uses within the waterfront redevelopment plan and said the borough envisions different future uses for the area. Several residents said they liked the plan so long as proposed amenities would be maintained.