Maintenance director Ms. Jolynn Moreno reported a smoke test found deteriorated pipe fittings and a damaged lead gasket at the high school; initial repairs estimated at approximately $2,000, with additional costs likely to access pipes behind restroom walls.

Ms. Jolynn Moreno told the board that an odor complaint at the high school prompted a smoke test that uncovered deteriorated pipe fittings and a damaged lead gasket in the main plumbing system. She said initial repairs are estimated at approximately $2,000, but additional costs are expected because some plumbing will require access behind restroom walls; photos of the damage were shared with the board.

Moreno framed the work as a standard facilities repair with potential additional labor and material costs. The board approved other facilities-related spending later in the meeting (the gym AC replacement); no separate vote on the plumbing repairs was recorded in the transcript.