Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the 2026 Bond Design Build topic

No spam. Unsubscribe anytime.

Silverton ISD Board selects design-build for proposed 2026 bond projects and authorizes RFQs

Silverton Independent School District Board of Trustees · January 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees unanimously adopted a resolution selecting design-build as the construction delivery method for proposed 2026 bond projects, authorizing the superintendent to issue Requests for Qualifications and set weighted criteria under Texas Government Code Chapter 2269, Subchapter G.

The Silverton Independent School District Board voted to adopt a resolution selecting design-build as the construction delivery method for the district’s proposed 2026 bond projects at its Jan. 20 meeting.

President Dane Mullins moved to adopt the resolution authorizing the Superintendent to issue Requests for Qualifications and establish weighted criteria, and to authorize the Superintendent or her designee to take actions necessary for the projects under Texas Government Code Chapter 2269, Subchapter G. Trustee Dusty Martin seconded the motion. The recorded vote was unanimous in favor.

The minutes record the board’s choice of the design-build procurement route and explicit delegation to the superintendent to start the RFQ process and set evaluation criteria. The posted minutes do not list specific projects, estimated bond amounts, or a schedule for RFQs; those details were not included in the version of the minutes provided.