Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Selectboard flags town garage structural issues, Sunshine Room leak; Little School painting quote set

Town of Weston Selectboard · March 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board discussed structural concerns at the Town Garage (support pillars, concrete deterioration, insulation and bathroom repairs), authorized inspection of a Sunshine Room roof leak, and scheduled a March 27 contractor visit for Little School painting quotes.

Town facility maintenance was a substantive topic at the March 10 meeting. The Selectboard discussed structural concerns at the Town Garage, including compromised support pillars, concrete deterioration attributed to salt exposure, and needs for a replacement door, wall insulation and bathroom repairs. The board recorded these items for follow-up and budgeting consideration.

The Sunshine Room ceiling showed evidence of water intrusion; the board will contact the contractor who completed the firehouse roof to inspect and assess interior damage. Separately, Shawna Batogowski will meet a contractor on March 27 to obtain a quote to paint two sides of the Little School building.